Emera Maine: Certificate of Public Convenience and Necessity

In 2014 and 2015, Verrill Dana has represented Emera Maine before the PUC in securing a CPCN for Emera’s proposed 138 kV transmission line providing a new interconnection between the Northern Maine electric system and the New Brunswick, Canada system. The proposed line is needed to address reliability concerns regarding the ability of the Northern Maine transmission system to meet customer demand under peak load conditions.